Piraeus, Greece (PortSEurope) December 20, 2017 – The first gas turbine turbo compressor units to be installed in the Trans Adriatic Pipeline’s (TAP) compressor station near Kipoi have been delivered to site via the port of Piraeus, Athens. On 17 October, the first turbine compressor unit was successfully offloaded and located onto the previously constructed concrete…
Subscribe or log in to continue reading
PortSEurope offers an English-language daily coverage from over 200 ports in the Mediterranean, Black and Caspian Seas as well as a fully indexed and easily searchable database with more than 15,000 articles.