Santa Cruz de Tenerife, Canary Islands, Spain (Ports Europe) November 14, 2024 – The Port of Santa Cruz de Tenerife will have the largest capacity floating dock in 2026. The dock will be built at the Huarun Dadong Dockyard (HRDD) and will be capable of lifting vessels of up to 22,000 tonnes, 230 metres long…
Subscribe or log in to continue reading
PortSEurope offers an English-language daily coverage from over 200 ports in the Mediterranean, Black and Caspian Seas as well as a fully indexed and easily searchable database with more than 15,000 articles.